Publications of B. Heinemann
All genres
Journal Article (139)
41.
Journal Article
136, Pt. A, pp. 340 - 344 (2018)
Technology developments for a beam source of an NNBI system for DEMO. Fusion Engineering and Design 42.
Journal Article
89, 10I139 (2018)
Neutron measurements at the ELISE neutral beam test facility and implications for neutron based diagnostics at SPIDER. Review of Scientific Instruments 43.
Journal Article
136, Pt. A, pp. 569 - 574 (2018)
Latest achievements of the negative ion beam test facility ELISE. Fusion Engineering and Design 44.
Journal Article
2052 (1), 040004 (2018)
First beam extraction experiments at BATMAN upgrade. AIP Conference Proceedings 45.
Journal Article
89, 052102 (2018)
Deuterium results at the negative ion source test facility ELISE. Review of Scientific Instruments 46.
Journal Article
2052 (1), 040001 (2018)
Long pulse operation at ELISE: Approaching the ITER parameters. AIP Conference Proceedings 47.
Journal Article
60, 085007 (2018)
Initial caesium conditioning in deuterium of the ELISE negative ion source. Plasma Physics and Controlled Fusion 48.
Journal Article
57, 116007 (2017)
Towards powerful negative ion beams at the test facility ELISE for the ITER and DEMO NBI systems. Nuclear Fusion 49.
Journal Article
1869 (1), 030004 (2017)
Operation of large RF sources for H-: Lessons learned at ELISE. AIP Conference Proceedings 50.
Journal Article
19, 015001 (2017)
Towards large and powerful radio frequency driven negative ion sources for fusion. New Journal of Physics 51.
Journal Article
1869 (1), 030006 (2017)
Performance of the BATMAN RF source with a large racetrack shaped driver. AIP Conference Proceedings 52.
Journal Article
123, pp. 843 - 846 (2017)
Experimental investigation of beam-target neutron emission at the ELISE neutral beam test facility. Fusion Engineering and Design 53.
Journal Article
123, pp. 263 - 267 (2017)
Preparation of the ELISE test facility for long-pulse extraction of negative ion beams. Fusion Engineering and Design 54.
Journal Article
123, pp. 381 - 384 (2017)
Characterization and performance improvement of the large titanium sublimation pumps in the AUG and W7‐X neutral beam injectors. Fusion Engineering and Design 55.
Journal Article
57, 086027 (2017)
The ITER Neutral Beam Test Facility towards SPIDER operation. Nuclear Fusion 56.
Journal Article
19, 085004 (2017)
The PRIMA Test Facility: SPIDER and MITICA test-beds for ITER neutral beam injectors. New Journal of Physics 57.
Journal Article
123, pp. 32 - 39 (2017)
A substantial step forward in the realization of the ITER HNB system: The ITER NBI Test Facility. Fusion Engineering and Design 58.
Journal Article
57, 102020 (2017)
Major results from the first plasma campaign of the Wendelstein 7-X stellarator. Nuclear Fusion 59.
Journal Article
1869 (1), 030003 (2017)
Long pulse, high power operation of the ELISE test facility. AIP Conference Proceedings 60.
Journal Article
87, 02B307 (2016)
Towards 20 A negative hydrogen ion beams for up to 1 h: Achievements of the ELISE test facility (invited). Review of Scientific Instruments