Publikationen von B. Heinemann
Alle Typen
Zeitschriftenartikel (139)
2018
Zeitschriftenartikel
136, Pt. A, S. 340 - 344 (2018)
Technology developments for a beam source of an NNBI system for DEMO. Fusion Engineering and Design
Zeitschriftenartikel
89, 10I139 (2018)
Neutron measurements at the ELISE neutral beam test facility and implications for neutron based diagnostics at SPIDER. Review of Scientific Instruments
Zeitschriftenartikel
136, Pt. A, S. 569 - 574 (2018)
Latest achievements of the negative ion beam test facility ELISE. Fusion Engineering and Design
Zeitschriftenartikel
2052 (1), 040004 (2018)
First beam extraction experiments at BATMAN upgrade. AIP Conference Proceedings
Zeitschriftenartikel
89, 052102 (2018)
Deuterium results at the negative ion source test facility ELISE. Review of Scientific Instruments
Zeitschriftenartikel
2052 (1), 040001 (2018)
Long pulse operation at ELISE: Approaching the ITER parameters. AIP Conference Proceedings
Zeitschriftenartikel
60, 085007 (2018)
Initial caesium conditioning in deuterium of the ELISE negative ion source. Plasma Physics and Controlled Fusion 2017
Zeitschriftenartikel
57, 116007 (2017)
Towards powerful negative ion beams at the test facility ELISE for the ITER and DEMO NBI systems. Nuclear Fusion
Zeitschriftenartikel
1869 (1), 030004 (2017)
Operation of large RF sources for H-: Lessons learned at ELISE. AIP Conference Proceedings
Zeitschriftenartikel
19, 015001 (2017)
Towards large and powerful radio frequency driven negative ion sources for fusion. New Journal of Physics
Zeitschriftenartikel
1869 (1), 030006 (2017)
Performance of the BATMAN RF source with a large racetrack shaped driver. AIP Conference Proceedings
Zeitschriftenartikel
123, S. 843 - 846 (2017)
Experimental investigation of beam-target neutron emission at the ELISE neutral beam test facility. Fusion Engineering and Design
Zeitschriftenartikel
123, S. 263 - 267 (2017)
Preparation of the ELISE test facility for long-pulse extraction of negative ion beams. Fusion Engineering and Design
Zeitschriftenartikel
123, S. 381 - 384 (2017)
Characterization and performance improvement of the large titanium sublimation pumps in the AUG and W7‐X neutral beam injectors. Fusion Engineering and Design
Zeitschriftenartikel
57, 086027 (2017)
The ITER Neutral Beam Test Facility towards SPIDER operation. Nuclear Fusion
Zeitschriftenartikel
19, 085004 (2017)
The PRIMA Test Facility: SPIDER and MITICA test-beds for ITER neutral beam injectors. New Journal of Physics
Zeitschriftenartikel
123, S. 32 - 39 (2017)
A substantial step forward in the realization of the ITER HNB system: The ITER NBI Test Facility. Fusion Engineering and Design
Zeitschriftenartikel
57, 102020 (2017)
Major results from the first plasma campaign of the Wendelstein 7-X stellarator. Nuclear Fusion
Zeitschriftenartikel
1869 (1), 030003 (2017)
Long pulse, high power operation of the ELISE test facility. AIP Conference Proceedings 2016
Zeitschriftenartikel
87, 02B307 (2016)
Towards 20 A negative hydrogen ion beams for up to 1 h: Achievements of the ELISE test facility (invited). Review of Scientific Instruments